Nor-Shipping
![](https://ca22d198c8.cbaul-cdnwnd.com/f360b76883491bf4b08445682d3f6634/200000018-7cd957dd4c/DSCF6094.jpg?ph=ca22d198c8)
In this project we have been working on Nor-Shipping, which has been our client. We have worked in a team of 10, where I and three others were leaders. We were commissioned by Nor-Shipping to design an entrance to their Disruptive Sustainability Hall. The entrance hall should be as a portal to an underwater world. Our assignment was to make the entrance different and drawing attention to the entrance area using visual, interactive and physical effects.
![](https://ca22d198c8.cbaul-cdnwnd.com/f360b76883491bf4b08445682d3f6634/200000022-0377304702/DSCF6070.jpg?ph=ca22d198c8)
![](https://ca22d198c8.cbaul-cdnwnd.com/f360b76883491bf4b08445682d3f6634/200000019-afc81b0c25/DSCF6065.jpg?ph=ca22d198c8)
![](https://ca22d198c8.cbaul-cdnwnd.com/f360b76883491bf4b08445682d3f6634/200000016-4179442758/DSCF6083-kopi.jpg?ph=ca22d198c8)
The solution was a geometric wave that leads the visitors into the hall. By using moving lights inside the installations and outside them we tried to catch peoples attention.
![](https://ca22d198c8.cbaul-cdnwnd.com/f360b76883491bf4b08445682d3f6634/200000133-618ed62875/B%C3%B8lgen.jpg?ph=ca22d198c8)
![](https://ca22d198c8.cbaul-cdnwnd.com/f360b76883491bf4b08445682d3f6634/200000134-20efb21ea3/B%C3%B8lgen.gif?ph=ca22d198c8)
The wave was made in light materials such as polycarbonate with a movable wooden frame. This made the transportation manageable.